A five-day fitting timeline for a short Shanghai trip
Five days can work, but only if the fitting sequence is planned in advance and the style direction is already narrow.
Most of the work should happen before day one
A short trip works best when the visitor has already shared dates, reference images, and service type before arriving.
The fitting calendar needs to protect one real correction point
Trying to remove the fitting stage entirely usually creates more risk than it saves. Even on a five-day trip, the order needs space for one meaningful review.
- Day 1 for consultation and measurements.
- A mid-trip fitting for balance and correction.
- A final collection or shipping handoff at the end.
A short schedule still needs a backup path
Shipping should stay on the table from the start in case the last timing assumption changes.